http://xx.binghe88.com/member.asp?action=view&memName=RobBertram670157154 - ikea installers -
Kitchen Cupboard Installation - Step-By-Step Instructions on how to Set up Kitchen area Cabinets Yourself
Given that you have got your new kitchen area cabinets, you will be all set to maneuver on to the future huge action.....Setting up your kitchen cupboards. When the actual installation of the Kitchen Cabinets isn'tall that onerous, the essential 1st stage is measuring and marking out where the cupboards will go. By inserting format markings around the walls and flooring, it will not only enable you to with kitchen cupboard placement and stud locations, but it will likely help you find the place adjustments and shims might be needed. In advance of we get rolling you'll find a pair of things that you will want for that task:
Pencil
Stage or Laser Amount
Drill
Tape Evaluate
Stud Finder
Clamps
1" x 3" Piece of lumber (6'-8' in size) or an Inverted U-shaped frame (see notes under)
Shims
Screws (very long more than enough to go one 1/2 into your studs)
Utility knife or chisel
Marking Compass
An extra established of palms (you could possibly really have to bribe one particular of your respective pals)
As I mentioned earlier mentioned, you have the option of utilizing a bit of 1' x 3' lumber with the installation or developing a body to aid the cabinets (I have bundled a picture of the sample body beneath). This can be made out of 2' x 4's and should be tall ample to assistance the underside of the wall cupboards. Should you program on putting in more than one kitchen area, then I'd counsel the body, but a chunk of lumber will do exactly high-quality if this is the just one time celebration. In both scenario, you will have to have one more set of palms to help with all the set up.
In cases like this we acquired (RTA) Ready-To-Assemble Kitchen Cupboards from RTA Kitchen area & Bathroom Cupboard Store. Now the kitchen area cupboards are assembled, we are ready to start marking out our structure lines. Some people start with the base cupboards, but we are going to start with all the wall cupboards initially. There is no right or wrong way to start, I just prefer to start using the upper cabinets very first.
1. Use a level and a pencil to draw a parallel line across the wall about 3 inches up from the floor. Evaluate down from this line, to your floor, and find the floors high point (if it has just one), and mark a line at that point. From that high point, Measure up 34 1/2 inches and draw a degree line across the wall to designate the top in the base cupboards.
two. Given that you have got the top with the base cabinets marked, evaluate up an additional 19 1/2 inches and a amount line across the wall to indicate the bottom from the wall cabinets. Lightly mark each cabinets' dimensions and placement around the wall to make sure that your original format is correct.
three. Use a stud finder to track down the wall studs. Use a pencil to mark the stud places at least 6 inches previously mentioned and down below the line for that bottom of the wall cupboards. Draw straight vertical lines between the top and bottom marks to indicate the center of your studs.
4. Should you decided to go with all the bit of 1' x 3' lumber, now is where by you can use (for those who decided to go with all the U-shaped body, it will eventually come into play after all your lines are laid out). Screw a temporary 1' x 3' assistance rail for the wall, aligning the top edge of the rail with the line for that bottom edge from the wall cupboards. Attach it by driving 3 or 4 two inch screws through the rail to the wall studs.
5. Since we have all the lines marked, it is time to start setting up your kitchen cupboards. We are going to start with all the corner cupboard (here is exactly where your helper's added set of hands might be needed). Place the corner cupboard onto the temporary help rail and have your helper hold the corner cabinet in place. Drill pilot holes through the sturdy cupboard back or its help rail and into the wall studs. Screw the cabinet in the wall working with two screws that are extended enough to penetrate the studs by at least 1 1/2 inches. Check the top in the cabinet for level and the front on the cabinet for plumb. If you really need to correct the position, just back the screws out a little bit and top shims behind the cupboard at the stud places. If it is plumb and stage, drive the screws all the way in and add several additional into each stud to ensure that the cupboard is secured tightly to the wall.
6. Now we are going to maneuver onto the cabinets on both side with the corner cabinet. As you install each just one, use the clamps to secure each cupboard for the neighboring cabinet and then check it for plumb with your level. On faceframe cabinets, it is often a good idea to drill two 1/8 inch pilot holes through the sides with the faceframe and use screws. In this case, with frameless, ready-to-assemble kitchen cupboards we are going to screw through the plywood sides and use shims in between the cabinets to ensure a tight fit and make sure that the cabinet faces are plumb.
7. After all the wall cupboards are in place, set up the corner or end base case cabinet. Use shims in which needed to stage the cupboard and raise it up to your line which indicates the high point from the floor. Be sure it is stage from front to back and from side to side, then screw it to your wall studs. In the event you don't have a diagonal corner cabinet or blind base cabinet in the corner, push the adjoining cupboard into place and clamp the two units together. Add a filler strip if needed to allow the doors and drawers sufficient clearance to open and close properly. If necessary, tap shims under the cabinet and behind it to adjust for plumb and level.
8. Drive screws through the cupboard back (and shims) into the wall studs. Trim any excess material from the shims with a sharp chisel or knife. Continue to add adjoining cabinets within this manner, joining them the same way you connected the wall cabinets in action 6.
9. If your cupboards end up butting against a further wall, it's possible you'll have to have a filler strip to make up the last few inches. When you have custom cabinets, they must have been built to fill this gap, but in case you are working with stock or RTA Kitchen Cupboards the filler strip might be needed. If you do need to have to use a filler strip, leave the last cupboard detached from the other cabinets. Clamp a straightedge towards the face with the nearest installed unit, extending far ample for you to put alignment marks about the end wall. Allow a 3/4" offset behind those marks (for that thickness in the filler piece) and fasten a cleat into the wall. Then put in and fasten the last cabinet and evaluate the gap between its face frame and the wall.
If the wall is flat, simply rip the filler board to your required width and fasten it in place. If the wall is irregular, you'll need to scribe-fit the filler board. Start by setting a marking compass on the width of your gap, then place a strip of 1"-wide masking tape along the filler board in the area exactly where it needs to be trimmed. Clamp the board for the end cabinet's face body, then trace the wall contour with the compass. Remove the board and cut along the scribe line with a jig saw, then reinstall it to check the fit. When it's right, drive screws through the adjacent face body in to the edge with the filler board. Screw or nail the other side on the cleat.
At this point, your kitchen area cabinet set up is complete. For those who purchased matching crown molding or any other details, these should be easily installed now. Depending on whether you had to use shims under the base cupboards, you might need to set up some trim pieces by the toe kicks to cover up the shims or any gaps at the underside of your kitchen cabinets.
I hope this helps make your kitchen area cabinet set up as smooth as possible. When you need any assist with cupboard selection, kitchen layout tips, or ideas for cupboard styles, check out RTA Kitchen area & Bathroom Cupboard Store.